Beadnell Holiday Village, Beadnell

Working with DP Builders Limited, we are proud to have fabricated and erected the steelwork for Beadnell Holiday Village.

In total we provided circa 5 tonnes of structural steelwork. All of which was designed to BS5950 and CE accredited.

The steel work was treated to 1no. coat of zinc phosphate primer to protect it from the elements.

Our surveying team marked out the exact locations within each build so that we could precisely drill the holes for the resin anchors to secure the steel work to the concrete base. 

Once our fabrication team had finished manufacturing the steel work at our factory in Amble, it was was delivered to site. Where our erection team put up it up, aligning it and leveled it to perfection.